Official Project Justification Brief | Greyline Performance
Official Procurement Justification
TO: Office of the City Manager / Budget Committee
FROM: Emergency Management Operations / Infrastructure Security
SUBJECT: Hardening Municipality RF Infrastructure via Greyline Tactical Assets
1. PROPOSAL: This document justifies the procurement of Greyline 6061-T6 heavy-wall aluminum radiators as a Permanent Property Asset and capital improvement for municipality continuity. By utilizing Vertical Dipole Antenna (VDA) physics, these assets provide mission-critical HF (160-6M) coverage while maintaining a low-visibility civic profile.
STATUS: 100% MADE IN USA | FAR 52.204-24 & SECTION 889 COMPLIANT.
2. TECHNICAL SUPERIORITY: Utilizing proprietary VDA physics, these assets require zero buried radials, allowing for immediate deployment on rooftops, asphalt, or rocky terrain where traditional grounding is impossible. This system is designed for 100% duty-cycle reliability for ALE and digital modes during primary network backhaul failure.
3. RESILIENCE PROFILE: Constructed from heavy-wall 6061-T6 Aircraft-Grade Aluminum. This alloy is selected for its high strength-to-weight ratio and natural resistance to atmospheric corrosion. Engineered for a multi-decade service life in extreme environments (155+ MPH), representing a permanent infrastructure improvement.
4. RECOMMENDATION: Immediate procurement of Greyline assets to fulfill EMCOMM continuity mandates under the EVOLVE IT modernization framework.