Order Status: Greyline Antenna Logbook Updates 6061-T6 Manufacturing

 

Made in USA · Sun Valley, Idaho · Shipped M–F

Order Status & Production Logbook

Every Greyline antenna is hand-inspected in Sun Valley, Idaho before it ships. We don't rush the precision work. This page gives you a transparent look at where things stand — current lead times at the top, production history below. Check your email for your tracking number once your order ships.

Current Status — Updated March 2026

Estimated lead time: 1–3 weeks from order to shipment.

We're running into pre-season demand with a queue of a group of orders ahead of new placements. We ship from stock when available — same or next day in normal conditions. A significant stock build-out is underway and will resolve the queue over the next 4–6 weeks. We won't tell you two weeks and then surprise you with five. We've been there and don't like it either.

1–3 Weeks

Current Build Queue

2–5 Days

USA Ground Transit

M–F Daily

Shipping Schedule

While You Wait

Use the time well. Your install will thank you.

Read the Assembly Guide

Walk through every installation step before the box arrives. Operators who read it first are on the air in under an hour.

Assembly Docs →

Plan Your Tuner Setup

Remote base-mount or shack-side? The decision affects coax quality choice (not length) and installation layout. Understand it before you dig.

Tuner Guide →

Understand the Physics

Why no radials? Why does the VDA work? The Signal Lab gives you the first-principles foundation — written to an RF Engineering standard.

What Is a VDA? →

Shipping Information

What to Expect From Order to Antenna.

Stage What Happens Timing
Order Placed Confirmation email sent. Order enters build queue. Immediate
Build & Inspection Hand-assembled and inspected in Sun Valley, Idaho. Every component verified before boxing. See current status above
Ships Tracking number sent to your email. Ships M–F from Sun Valley, Idaho. You'll receive tracking same day it ships
USA Delivery Free ground shipping. Most continental US locations in 2–5 business days. DX 3-7 days. 2–5 business days
International Competitive rates calculated at checkout. Europe ~$100-250. Contact us for quotes on large orders. Varies by destination

Tariffs & USA Manufacturing: Despite global pressure on metal pricing, we remain 100% Made in USA using premium 6061-T6 aircraft-grade aluminum. We absorb cost increases through process refinement to keep pricing reasonable. Free shipping within the USA is not going away.

Production Logbook

Transparent Updates from Sun Valley.

A running record of where we've been. Scroll for history. The current situation is always at the top of this page.


January 20, 2026

Warm up those radios — new products ahead.

The holiday rush is behind us and early spring is arriving in Idaho. We're nearly caught up on the queue and will be announcing a few complementary products we've been designing through the winter months. Stay tuned. 73/88 de Greyline


January 2, 2026

Happy New Year. We're in the office.

Strong coffee, smart prep, and a clean start to the new year. Staging for the first full shipping week starting Monday. Tracking numbers going out shortly.


December 1, 2025

Winter orders prioritized and moving.

Orders for operators in cold-weather climates — expecting frozen ground — have been prioritized and shipped. Another group going out this week. It's a strong year-end with the bands humming. Let us know how you're doing out there.


October 22, 2025

Full throttle. Maximum effort.

The fall/winter surge brought a temporary queue. Our Made in USA commitment means we don't rush the precision work on your antenna. The 6061-T6 machining and assembly are running at maximum capacity. Demand for the DX VDA systems remains strong. Thank you for your patience and your trust.


August 1, 2025

Strong summer. Shipping daily.

A strong summer for Greyline and the DX community. Shipping daily M–F from the W7 mountain west. Ham Radio is fun again.


April 8, 2025

Full capacity. Shipping daily for summer DX season.

Operating at full capacity, dedicated to getting RF radiators into your hands quickly for the summer DX season ahead.


March 20, 2025

Spring rush. Bands heating up.

Grateful for the opportunity to maintain a steady daily shipping schedule as the bands come back to life.


2025 — Ongoing

100% Made in USA. Holding the line on pricing.

Despite global tariff pressure on metals, we remain 100% Made in USA using premium 6061-T6 aircraft-grade aluminum and 316 stainless steel hardware. We absorb cost increases through process refinement. Free USA shipping is not going away.


September 1, 2024

Same/next day shipping. HOA and XYL approved.

Busy producing antennas. Shipping same or next day. Proud to be HOA and XYL approved — Smart, Strong, and Elegant at every QTH.


July 1, 2024

Smooth sailing. Continuous production.

Thank you for the opportunity to serve the HF radio community. Shipping daily, building daily.

Questions about your specific order? Call us directly — 435-200-4902 — and we'll tell you exactly where it stands. Ham Radio is fun again! Pass it on... 73, The Greyline Performance Team · Sun Valley, Idaho